cbd gummies greece | cbd gummies work for ed | sunset cbd gummie mg | cbd gummy bears for sex | diamond cbd chill gummies | chill gummies 100x cbd | virility cbd gummies | bayer cbd gummies | theracalm cbd gummies | mule cbd gummies uk | proper cbd gummy | wana cbd gummies review | scientific cbd gummies | blueberry gummies cbd | biomdplus cbd gummies | cbd gold gummies | cbd diy gummies | cbd releaf hemo gummies | cbd vantage gummies | cbd gummies athens | best male sex drive enhancer | stringz male enhancer | male enhancement fake | is cbd gummies good for ed | xxl penis enlargement cream | buy cbd gummies for ed near me | king cobra gummies amazon | gummies to enlarge your penis | male enhancement coffee recall | male enhancement free trial | ignite keto gummies review | gummy bear recipe keto | health keto acv gummies | simpli fit keto gummy | dna keto gummies | diet pep pills | joyketo keto acv gummies | x10 boost keto gummies review | best walmart weight loss pills | fda approved keto pill | ben napier weight loss gummies | ketology keto gummies website | cat diet pills |
{"id":918478,"date":"2023-05-01T07:58:18","date_gmt":"2023-05-01T11:58:18","guid":{"rendered":"https:\/\/clintoncountydailynews.com\/?p=485900"},"modified":"2023-05-01T07:58:18","modified_gmt":"2023-05-01T11:58:18","slug":"public-hearing-set-for-may-11-for-state-road-32-roadway-improvement","status":"publish","type":"post","link":"https:\/\/boonecountydailynews.com\/public-hearing-set-for-may-11-for-state-road-32-roadway-improvement\/","title":{"rendered":"Public Hearing Set for May 11 for State Road 32 Roadway Improvement"},"content":{"rendered":"

\"\"The Indiana Department of Transportation announces the public hearing for the State Road 32 roadway improvement project will be held on Thursday, May 11 at Western Boone Junior-Senior High School, at 1205 State Road 75, Thorntown. The hearing will be held from 6-9 p.m.<\/p>\n

The purpose of this proposed project is to maintain the road’s level of service, restore the rideability of the pavement, and to improve access control at the gas station in the southwest quadrant of the S.R. 32 intersection with S.R. 75.<\/p>\n

The overall project length includes work from approximately 3.69 miles west of S.R. 75 to approximately 0.5 miles west of I-65. The proposed project includes constructing a functional Hot Mix Asphalt (HMA) overlay, and the addition of three passing lanes (two eastbound and one westbound) that will each be approximately one mile long. The HMA overlay portion of the project will be located on S.R. 32 from 0.05 miles west S.R. 75 to 0.5 miles west of I-65. The added passing lanes portion of this project will be located on S.R. 32 from 3.69 miles west of S.R. 75 to 2.47 miles east of S.R. 75.\u00a0In total, the proposed improvements will involve 6.62 miles of milling and resurfacing work and approximately three miles of added passing lanes. New roadside ditches will need to be established within the passing lane areas. The cross section of the passing lane additions will include two, 12-foot travel lanes, one 12-foot passing lane and three-foot paved shoulders. An additional five-foot aggregate shoulder will be installed along the passing lane for a total shoulder width of eight-feet. This project also involves various culvert replacements along S.R. 32. This project will also include the addition of a curbed, concrete island to better define the entrance to the gas station, located on the southwest corner of the S.R. 32 intersection with S.R. 75.<\/p>\n

This proposed project involves phased construction, and is not expected to utilize a complete road closure. After the passing lanes are constructed, the HMA overlay will be constructed utilizing a flagging operation. Two-way traffic is anticipated to be maintained along S.R. 32. Access to residents and businesses will be maintained during construction.\u00a0The estimated cost of this project is approximately $16,500,000 and uses both federal and state funds.<\/p>\n

INDOT will coordinate with emergency services, local school corporation officials and project stakeholders to ensure potential disruptions and impacts are minimized as much as possible.<\/p>\n

Federal and state funds are proposed to be used for construction of this project. INDOT and the Federal Highway Administration have agreed that this project poses minimal impact to natural environment. A Categorical Exclusion (CE) environmental document has been prepared for the project. The environmental documentation and preliminary design information is available to view prior at the following locations:<\/p>\n