
The outside lane will now be closed in each direction. The inside lane will remain open, separated by drums and barrier walls. The new, inside left turn lanes will also now be open to traffic. Please continue to use caution throughout this area. The restrictions are expected to last through mid-July, weather permitting.
This contract was awarded to E & B Paving, LLC for over $2.4 million. The entire contract is expected to be completed in October of 2023, weather permitting.
INDOT urges motorists to slow down, use caution and consider worker safety when traveling through a work zone.